Applicable basis
IEC 60793 / IEC 60794 · ITU-T G.652.D (effective edition and test scope confirmed at RFQ)
02 — OS2 — OM4 — FTTX / PRODUCT CONFIGURATION
SKU / REFERENCE ID · FGT-FIBER-OS2-12C
A reference procurement configuration for campus and building-to-building single-mode backbone routes. The ordered cable code is finalized after armour, sheath and destination review.
Request this configuration ↗
TECHNICAL & PROCUREMENT RECORD
This is a public procurement reference configuration. Final materials, marking, evidence and the sellable order code are controlled by the formal quotation.
IEC 60793 / IEC 60794 · ITU-T G.652.D (effective edition and test scope confirmed at RFQ)
Reference starting point: 1,000 m; confirm by cable construction and drum plan.
Normally within 30 days after order confirmation; confirmed by fiber count and construction.
Fiber grade, armour, sheath, drum length and destination test requirements are confirmed before the final SKU is released.
APPLICATIONS
DATASHEET, TEST & CERTIFICATE ROUTE
Open the available evidence summary, then request the current datasheet or certificate for the exact quoted construction. No document on this page is a blanket claim for every variant.
NEED PRICING & LEAD TIME?
REQUEST A QUOTATION
Send quantity, destination market and any standard requirements. We confirm the suitable construction, packaging, evidence route and lead time before quotation.
ENGINEERING REVIEW / NEXT STEP
Start with the information you already have. FGT confirms the final construction, applicable documents and commercial route against the selected SKU, destination and project requirement.
01 / TECHNICAL SELECTION
02 / DOCUMENT PACKAGE
03 / COMMERCIAL CONFIRMATION
PROJECT RFQ
Monitored continuously — we will reply within 1 hour.